cam4122 cam4122
  • 01-04-2020
  • Physics
contestada


1. When is positive work done on a system? When is negative work done?

Respuesta :

sharmakanishk2901 sharmakanishk2901
  • 01-04-2020

Answer:

Bro I don't know

Explanation:

Answer Link

Otras preguntas

An 80-kg hiker climbs to the top of a tall hill and builds up 470,000 J of gravitational potential energy. How high did the hiker climb? meters
2 PointsIn the straightedge and compass construction of the congruent angle below,which of the following reasons can you use to prove that ZDEF LLJK?EFO A. Draw
List ten choses in French with their English meaning
Solve the following inequality. 4m +6<2 OR m74 > 3
Answer 1 of the 2 questions in this picture in the next 5 min I’ll give you a lot of points please and thank you!
A dialysis sac that is permeable to glucose and water is filled with water and placed in a beaker containing 20% glucose solution. Will there be a net transport
SOMEONE HELP ASAP! IM STUCKKKKKK
How do you graph solutions for inequalities on a coordinate plane?
Suppose Friendly Airlines is considering signing a long-term contract with the union representing its pilots. Friendly Airlines and the union both agree that re
Find the slope of the line that goes through the given points. (6,1) and (9,-1)