katriceervin12p8wls8 katriceervin12p8wls8
  • 02-05-2020
  • Mathematics
contestada

If it takes 12 weeks for the factory to be at full capacity, how many weeks would it take for the factory to be at half capacity?

Respuesta :

jam2282
jam2282 jam2282
  • 02-05-2020

Answer:

it takes 6 weeks fir the factory to be at half capacity

Step-by-step explanation:

half of 12 is 6

Answer Link
jojiwalt
jojiwalt jojiwalt
  • 02-05-2020

It would take 6 weeks to be at half capacity

Answer Link

Otras preguntas

A loose money policy is one which is intended to increase business activity. True False
What would x equal( rounded to the nearest tenth)
The perimeter of an equilateral triangle is 6x - 24. Which expression represents the length of one side?
You will no doubt want to consider the following, but you are certainly free to (and encouraged to) discuss any other issues you believe to be pertinent: manage
Jill drew a picture that was 9 inches by 12 inches. She needs to scale the picture so that it is 39 ft by 52 ft for a mural on the school cafeteria wall. What i
Marsha is buying plants and soil for her garden. The soil cost $4 per bag, and the plants cost $10 each. She wants to buy at least 5 plants and can spend no mor
Hellohello, if you able to help me then please do. (:
Find the surface area of the prism
Which formula uses mass in the equation?
According to Archimedes, the buoyant force on an object is equal to ____. a. the weight of the object c. the density of the fluid b. the fluid pressure on the o