bluebutterfly2877
bluebutterfly2877 bluebutterfly2877
  • 01-11-2020
  • Mathematics
contestada

240 examiners can complete the
correction work in 8 days. If the work has
to be completed in 6 days, how many
more examiners should be employed?​

Respuesta :

balkrishnapradhan947
balkrishnapradhan947 balkrishnapradhan947
  • 01-11-2020

40 more examiners.....

Answer Link
juraijsaeed
juraijsaeed juraijsaeed
  • 01-11-2020

Answer:

240 x 8 = 1920

1920 / 6 = 340

340 examiners can complete work in 6 days

Answer Link

Otras preguntas

In what part if India was Sikhism predominant? A. northwest India B. southwest India C. northeast India D. southeast India
What is the main source of potential energy needed for cellular metabolism
Anna Hikes 6.4 miles during a 4-day vacation . If she hikes the same distance each day, how many miles does she hike each day? A) 1.06 miles B) 1.1 miles C) 1.
"the area where an organism lives its life including the living and nonliving factors."
which of the following organelles is common to both prokaryotic and eukaryotic cells A. cytoskeleton b. nucleus c. nucleolus
HELPP Which ordered pair (x, y) is a solution to the given system of linear equations? 3x+3y=-3 -2x+y=2 (–1, 0) (0, –1) (1, –2) (1, 4)
Protests that group together and move by streaming along a mass of cytoplasm are called?
The price of a television was reduced from $250 to $200. by what percentage was the price of the television reduced?
I need help!!!!!!!!!!!!!!!!!
What is the value of y in this triangle?