kyliepugh19001 kyliepugh19001
  • 02-01-2021
  • Business
contestada

If members of a project team report formally to a functional manager (not directly to the project manager) what type of organization is it

Respuesta :

tilermaelee
tilermaelee tilermaelee
  • 02-01-2021

Answer:

Matrix organization

Explanation:

Hope this was helpful! Have a good day

Answer Link

Otras preguntas

Whereas superficial flexors in the anterior compartment of the forearm originate from the _____ epicondyle of the humerus, the superficial extensors in the post
How does the caption develop the central idea? It shows that most women choose not to protest wearing veils. It demonstrates the differing opinions among women
why were they called the "Old Immigrants"?
A long straight wire carrying a 2.5 A current passes through the centre of a rectangle of dimensions 2.5 m by 7.5 m at the angle of 45 degrees to the surface no
-p(d+z)=-2z+59 solve for z.
Which three statements are true as they relate to supply and demand? As supply rises, prices generally decrease. As demand decreases, costs generally increase.
____________are a common form of wind deposit in desert regions and near​
Neutrality is no longer feasible or desirable where the peace of the world is involved and the freedom of its peoples, and the menace to that peace and freedom
Solve the equations 7 = 4(c - 6)
The triangle on the grid will be translated two units down. Which shows the triangle when it is translated two units down?