hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

What is an inequality
Fill in the blanks with the correct form of the verb in parentheses. YOU MAY TAKE THIS ONLY ONCE. Los niños 1. (acostarse) a las nueve de la noche. Papá siempre
In a manufacturing process, a large, cylindrical roller is used to flatten material fed beneath it. The diameter of the roller is 1.00 m and while being driven
when did Muslim golden age reach it's height
Your friend in your statistics class is upset about a recent increase in the price to wash and dry a load of laundry. She wants to conduct a one proportion​ z-t
Compare the relationship between elements, atoms, molecules, and compounds.
Number the following igneous rock types according to how mafic they are, with 1 being the least mafic (most felsic) and 4 being the most mafic. A. Andesite.B. B
In order for Dr. Reynolds to send a CPOE from her office computer system to the computer system at the local hospital, a/an ____________________ must exist betw
Hopi Corporation expects the following operating results for next year: Sales $ 400,000 Margin of safety $ 100,000 Contribution margin ratio 75 % Degree of oper
How should the decimal point in 52.48 be moved to determine the product 52.48×105 ?